Refer to the exhibit. An engineer must configure FCoE on a Cisco Nexus switch. Which two command sets complete this configuration? (Choose two.)
A. vsan database vsan 10 interface vfc 10
B. interface vfc 10 bind interface ethernet 1/3 no shut
C. vsan database vsan 10 interface ethernet 1/3
D. interface vfc 10 bind interface fcoe-vfc 1/3 no shut
E. interface fcoe 10 bind interface ethernet 1/3 no shut
Correct Answer: AB